Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Doder Track Roller
D85 Bottom Roller
Dozer bottom roller
D65 lower roller
Single Track roller
Specifications for crawler excavator track roller |
||
Structure |
wheel body |
35MnB/40Mn2/40MnB/50Mn |
side cover |
QT500-7 |
|
shaft |
45# |
|
ring float |
GLKBTCr16Mo2NiCu |
|
O ring |
rubber |
|
Bimetal sleeve |
CuPb10Sn10 |
|
Hexagon socket bolt |
JB/T1000-1977 |
|
lubricating oil |
40# |
|
The main parameters |
name |
Track roller/bottom roller/support roller |
Part number |
7G0421 |
|
Color |
Black or Yellow |
|
Surface Hardness |
HRC48-54,deepth:4mm-10mm |
|
Technique |
Forging&Casting |
|
Warranty time |
2000 hour (Normal life 4000hours ) |
|
Certification |
ISO9001-9002 |
|
Delivery Time |
Within 30 days after contract established |
|
Package |
Fumigate seaworthy packing |
• Track roller is through quench-tempering processes to guarantee excellent mechanical properties,high strength and superior wear resistence to bending and breakage.
• Surface hardness of track roller is HRC50-60 for reduced wear and longer life, adding value to your products further to your business by maximizing durability of your products.
• Track roller,bottom roller,support roller have precise design, carefully manufactured for proper fix easy grousering heavy loaded capacity up to 50tons without compromising proper functioning of the excavators reliable quality, high cost performance,quality services. Our products, your best choice.
1) Do not oil and distort the rubber floating seal ring during assembling the rollers
2) A small amount of oil should be covered/coated on the contact surface while pressing the floating oil seal.
3) After finishing the assembling process,fill in 80% of clean extreme-pressure vehicle gear oil and confirm no leaking 4 hours later.
4) Track roller,bottom roller,support roller, lower roller,carrier roller, idler are mounted with long life well sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.
Company Information
Package
After-sales Service
1) 24 hours for after-sales service;
2) Offer us picture of using situation,goods,using details, then compensation after everything is finished within 3 working days.
3) Any claim due to the quality of products,the compensation is not more than the value of the products that have quality problem.
FAQ