• Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
  • Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
  • Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
  • Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
  • Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Type: Undercarriage Parts
Application: Excavator
Certification: CE, ISO9001: 2000
Condition: New
Colors: Black or Yellow
Warranty Time: One Year or 2000 Hours
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory

Basic Info.

Model NO.
EC200 D50/D53A/D58E/SD130/D9H/D9G/PC200-5/6/7/DH22
Payment Term
T/T, L/C at Sight, Western Union
Package
Wooden Case/Pallet
Name
Hot Sale Komatsu PC60 Forging Track Roller for Exc
Technique
Forging&Casting
Delivery Time
Within 30 Days After Contract  Established
Key Words
Ec290 Excavator Track Roller
Transport Package
Pallet/Wooden Case or Customized
Specification
PC60
Trademark
Dingtai
Origin
Fujian
HS Code
8431499900
Production Capacity
30000 Piece

Product Description


Product Information
Professional Supplier With Spare Parts EC200 Track Roller For Excavator
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Application
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g


Track roller is applicate for Energy & Mining, ground engaging part.

Related Products
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Features and Advantage
>>Heat-treatment, which is integrated heating and surface spray cooling under highpressure, to improve
internal mechanical properties to prevent deformation under heavy load. meanwhile high pressure hardness
and deep harden depth result in longer life.

>>O-ring: Have better oil leaking resistance and high-temperature resistance

>>Raw material of steel purchased from good steel groups to ensure quality.

>>Assembly line has multiple workbench, The rollers are automatically washed before assembling by the
washer to guarantee the cleanness and sealing performance of the production


Work Process
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

1) Do not oil and distort the rubber floating seal ring during assembling the rollers

2) A small amount of oil should be covered/coated on the contact surface while pressing the floating oil seal.

3) After finishing the assembling process,fill in 80% of clean extreme-pressure vehicle gear oil and confirm no leaking 4 hours later.

4) Track roller, carrier roller, idler are mounted with long life well sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.

Company Information
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g

Package & Customer
Ec210 Excavator Track Bottom Rollerd60/D65/Ty160/T160/D6c/D6d/D6h /D7g/D80/D85/Ty220/Ty230 /D155/D150/Ty320/SD8/D355/D375/Pd41/D50/D53A/D58e/SD130/D9h/D9g
After-sales Service
1) 24 hours for after-sales service;

2) Offer us picture of using situation,goods,using details, then compensation after everything is finished within 3 working days.

3) Any claim due to the quality of products,the compensation is not more than the value of the products that have quality problem.

FAQ
Q1:Are you a trade or a manufacure?
    A:We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric.
Q2:How can I be sure the Excavator Parts will fit my excavator?
    A:Give us correct model number/machine serial number/ any numbers on the parts  itself.Or measure the parts give us dimension or drawing.
Q3:How about the payment terms for Excavator Parts?
    A:We usually accept T/T or L/C. other terms also could be negotiated.
Q4:What is your minimum order for Excavator Parts ?
    A:It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable.
Q5:What is your delivery time for Excavator Parts ?
   A:FOB Xiamen or any Chinese port : 25-30days . If there are any parts in stock ,our delivery time is only 7-10 days. 
Q6:What about Quality Control?
   A:We have excellent tester, check every piece to ensure the quality is good,and strict control to ensure product safety into container.


Contact Us

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000
Terms of Payment
LC, T/T, Western Union