Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253

Product Details
Customization: Available
After-sales Service: Online Service
Warranty: 12 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
Fast Delivery
The supplier can deliver the goods within 30 days
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (9)
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
  • Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
Find Similar Products

Basic Info.

Model NO.
D9N / D9R
Type
Undercarriage Parts
Application
Bulldozer
Certification
CE, ISO9001: 2000
Condition
New
Material
35mnb/50mn
Colors
Black or Yellow
Warranty Time
One Year or 2000 Hours
Payment Term
T/T, L/C at Sight, Western Union
Package
Wooden Case/Pallet
Name
D65 Lower Roller Bulldozer Track Roller Bottom Rol
Technique
Forging Casting
Delivery Time
Within 25 Days After Contract Established
Key Words
Bottom Roller
Transport Package
Pallet/Wooden Case or Customized
Specification
D9N / D9R
Trademark
Dingtai
Origin
Fujian
HS Code
8431499900
Production Capacity
1500 Piece

Packaging & Delivery

Package Size
150.00cm * 150.00cm * 150.00cm
Package Gross Weight
900.000kg

Product Description


bulldozer track roller D9N / D9R double flange bottom roller single flange support Roller 7T1258 / 7T1253

Product Information
Bulldozer Track Roller

Doder Track Roller

D31 Bottom Roller

Dozer bottom roller

D7G lower roller 

Single Track roller

Specifications for crawler excavator track roller

Structure

wheel body

35MnB/40Mn2/40MnB/50Mn

side cover

QT500-7

shaft

45#

ring float

GLKBTCr16Mo2NiCu

O ring

rubber

Bimetal sleeve

CuPb10Sn10

Hexagon socket bolt

JB/T1000-1977

lubricating oil

40#

The main parameters

name

track roller/bottom roller/support roller/Lower Roller

Part number

7G0421

Color

Black or Yellow

Surface Hardness

HRC48-54,deepth:4mm-10mm

Technique

Forging&Casting

Warranty time

2000 hour (Normal life 4000hours   ) 

Certification

ISO9001-9002

Delivery Time

Within 25 days after contract established

Package

Fumigate seaworthy packing

Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253

Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253\

3.Feature:

1)Our track rollers are adopting through hardening system and spraying quenching system while complying with the stringent ISO System.

2)We are able to assure the part has excellent wear resistance even in the most severe working conditions

3)We are using advance machining centre,horizontal and vertical CNC machining to execute processes such as machining, drilling, threading and milling to ensure the qulity and precision of each component to ensure the accuracy of assembly dimensions. This is to maximize the life span of each component and minimize production cost per hour.

4).Well lubricated oil recycle system.

5). High hardness :HRC52-58,deepth:8mm-12mm

6). Deep hardened wear surface.

7). Good bronze bushings.

8).Undercarriage parts stock pictures will send before order.

9).All parts can check with part number,all parts can order follow part number.

10). Safe packing to protect the goods, such as wooden box,by tray.

11). Small quantity can accept.Sample order also accept.

12).Lifelong after-sales service.

13).Original /OEM /After Market quality and competitive price-2.Flexible payment terms.

14).Quick delivery time.

15).Exclusive agent accepted.

16).Have cooperated with many importers in us for more than 10 years.

17) Good metal fibrous tissue.

18) Resist abrasion and impact well.

19) Long life-expectation.

20) Good quality and competitive price.

21)We can provide customized products with special requirements.

22)Products sizeFollow OEM strictl.

23). One-stop service.good after service.

A.Full undercarriage parts of excavator and bulldozer are available: track roller/bottom roller/lower roller, front idler, sprocket rim/segment group,

carrier roller/top roller, track chain with shoes/track group.

B.Excavator spring assembly with OEM size, bucket link/H link, link rod/I link, track guard.

C.Ground Engaging Tools: bucket teeth, excavator buckets, cutting edge, and end bits

D.Hydraulic cylinder and seal kits: EX1200, PC1250 hydraulic cylinders are also available.

25). Factory direct price and Strict Quality Control.

We have our own factory and foreign trading office, attach much importance to items quality during the production and always check each goods before delivering.

4.Advantages:

1). Quality guarantee
2). Technical support
3). Gather different parts into one container 
4). Unobstructed communion 
5). Delivery Merchandise in time 
6). LCL is acceptable
7). OEM parts number guidance
8). Producing according to drawings.

9). We have advanced technoledge and 100% testing before delivery.

10). Quick delivery and competitive price.

11). The larger quantity you order, the better price and faster delivery we can supply.

12). We have a professional team to offer professional service for you.

13). We can offer used and new,OEM,good quality made in china parts to you.

14). The parts will give weight,price when quotation.

15). Genuine parts stock pictures will send before order.

16).All parts can check with part number,all parts can order follow part number.

17). Safe packing to protect the goods, such as wooden box, Iron sheet for our parts.

18).Small quantity can accept,Sample order also accept.

19). 24 hours oversea service.

20).One-stop purchasing service.

Full undercarriage parts of excavator and bulldozer are available:
Track roller/bottom roller/lower roller, front idler wheel assy, sprocket rim/segment group,
carrier roller/top roller, track chain with shoes/track group/ Track Adjuster/ Track Bolt&nuts

21). Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

22).World-class Quality.

23).Factory sale directly,with REASONABLE price.

24).We design and produce all the undercarriage parts follow original items strictly.
25) Only High Quality Parts Supplied:
Say No to mixed different quality parts, we only have one quality control standard on material, production line and QC, our aim is to supply high quality parts at competitive price, to help our customers do long-term business and easier after-sale service
 

Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253


Related Products
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253

Work Process
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253

1) Do not oil and distort the rubber floating seal ring during assembling the rollers

2) A small amount of oil should be covered/coated on the contact surface while pressing the floating oil seal.

3) After finishing the assembling process,fill in 80% of clean extreme-pressure vehicle gear oil and confirm no leaking 4 hours later.

4) Track roller, Lower roller,bottom roller,carrier roller, idler are mounted with long life well sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.

Company Information
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253

Package
Bulldozer Track Roller D9n / D9r Double Flange Bottom Roller Single Flange Support Roller 7t1258 / 7t1253


After-sales Service
1) 24 hours for after-sales service;

2) Offer us picture of using situation,goods,using details, then compensation after everything is finished within 3 working days.

3) Any claim due to the quality of products,the compensation is not more than the value of the products that have quality problem.

FAQ
Q1:Are you a trade or a manufacure?
    A:We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric.
Q2:How can I be sure the Excavator Parts will fit my excavator?
    A:Give us correct model number/machine serial number/ any numbers on the parts  itself.Or measure the parts give us dimension or drawing.
Q3:How about the payment terms for Excavator Parts?
    A:We usually accept T/T or L/C. other terms also could be negotiated.
Q4:What is your minimum order for Excavator Parts ?
    A:It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable.
Q5:What is your delivery time for Excavator Parts ?
   A:FOB Xiamen or any Chinese port : 25-30days . If there are any parts in stock ,our delivery time is only 7-10 days. 
Q6:What about Quality Control?
   A:We have excellent tester, check every piece to ensure the quality is good,and strict control to ensure product safety into container.


Contact Us

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now